FREMO meets
Zur Navigation springen
Zur Suche springen
Waldenburg 2025
In January 2025 the Southwest Ave module was at a FREMO meet for the first time. Some preparations were needed:
Transport housing
A lot can happen when transporting highly detailed modules, so something has to be built around it:
This picture shows Southwest Ave consisting of two segments, ready to go, protected at all sides. It only takes a few minutes to remove everything and to set up the module.
Januar 2025 Waldenburg
Southwest Avenue was for the very first time at a FREMO meet Januar 2025 in Waldenburg:
In the foreground you can spot Southwest Ave, the layout is nearly completely built. Next to it is the mainline of the USfine-layout, in the background all this greenish stuff is a different layout.